Complete reconstruction of a 110 kV line and 110 / 10 kV substation, including the replacement of old metallic lattice structures with composite poles.
The line served the increasing electricity needs of an important industrial and population center.
HVCRC® was selected by the utility after evaluating various options to reduce line losses and increase the line maximum ampacity.
Year: 2012
Project: Reconstruction of a 110 kV line
Customer: Alatau Zharyk
Location: Almaty area, Kazakhstan
Voltage: 110kV
Conductor length: >100km
Old Conductor: AC-95
New Conductor: HVCRC® 230/28 (Linnet size)