150kV in Kalimantan Barat (Indonesia)

Reconductoring project on a 150kV line in rural West Kalimantan, Indonesia

Year:  2018

Project:   Mempawah – Paritbaru

Customer:   PT PLN

Location:   Kalimantan Barat, Indonesia

Voltage:   150 kV

Conductor length: >200km

New Conductor: HVCRC/TW Hawk 

Stranding partner: PT Citra Mahasurya Industries

Results:
– Increased ampacity with existing structures
– Reduced losses at same ampacity


VEN Y DESCUBRE CÓMO PODEMOS CONTRIBUIR A TU PROYECTO

Contact