88kV line in Johannesburg (South Africa)

The project re-conductored a key segment of the transmission grid around the City of Johannesburg and the increased ampacity of the HVCRC® Conductor provides City Power Johannesburg with a solution for a critical congestion problem in the Johannesburg Grid.
Project installed by Edison Power Group, a leading turn-key contractor in Africa.

High Ampacity Low Sag HVCRC® conductor was used as a replacement of conventional conductors and strung on the existing towers thereby resolving the difficult Right of Way problem African utilities face.

This project demonstrated that HVCRC® Smart Conductor provides many advantages for construction of South Africa’s Smart Grid and supports the concept of a modern more efficient transmission grid.

Year2015

Project:   Kelvin Orchards

Customer:   City Power South Africa

Location:   Johannesburg, South Africa

Voltage: 88kV

Conductor length: >100km

Conductor used: HVCRC® 320/40 (Lisbon size)

COME AND DISCOVER HOW WE CAN CONTRIBUTE TO YOUR PROJECT

Contact