110kV line in Almaty (Kazakhstan)

Complete reconstruction of a 110 kV line and 110 / 10 kV substation, including the replacement of old metallic lattice structures with composite poles.
The line served the increasing electricity needs of an important industrial and population center.
HVCRC® was selected by the utility after evaluating various options to reduce line losses and increase the line maximum ampacity.

Year: 2012

Project: Reconstruction of a 110 kV line

Customer: Alatau Zharyk

Location: Almaty area, Kazakhstan

Voltage: 110kV

Conductor length: >100km

Old Conductor:  AC-95

New Conductor:  HVCRC® 230/28 (Linnet size)


ПРИХОДИТЕ И УЗНАЙТЕ, КАК МЫ МОЖЕМ ПОСОДЕЙСТВОВАТЬ ВАШЕМУ ПРОЕКТУ

Contact