Reconductoring project on a 150kV line in rural West Kalimantan, Indonesia
Year: 2018
Project: Mempawah — Paritbaru
Customer: PT PLN
Location: Kalimantan Barat, Indonesia
Voltage: 150 kV
Conductor length: >200km
New Conductor: HVCRC/TW Hawk
Stranding partner: PT Citra Mahasurya Industries
Results:
— Increased ampacity with existing structures
— Reduced losses at same ampacity