ACPR Losag Advanced reconductoring — EPC feedback & aerial footage
Nice aerial footage & EPC feedback from an ongoing advanced reconductoring project on a 220kV line for Transelectrica in Romania.
For this project in a mountainous area with a continental climate, ACPR Losag was selected for its outstanding ice load performance.
This is the first advanced reconductoring project in Romanian history, following our field tests in October 2023.
• Composite Core from Epsilon Cable
• Conductor stranding by Nexans
• Accessories from Dervaux / Sicame Group
• Installation by Electromontaj S.A. with field support from Nexans & Epsilon